A platform for research: civil engineering, architecture and urbanism
Standard Specification Clauses for Airfield Pavement Works. Part 4. Bituminous Surfacing
The Specification is divided into the following parts: Preliminaries; Earthworks and bases; Concrete; Bituminous surfacing; Surface treatments; Miscellaneous. The Parts of the Specification covers construction methods and most work matters likely to be encountered in the construction of new or maintenance of existing pavements for aircraft operation.
Standard Specification Clauses for Airfield Pavement Works. Part 4. Bituminous Surfacing
The Specification is divided into the following parts: Preliminaries; Earthworks and bases; Concrete; Bituminous surfacing; Surface treatments; Miscellaneous. The Parts of the Specification covers construction methods and most work matters likely to be encountered in the construction of new or maintenance of existing pavements for aircraft operation.
Standard Specification Clauses for Airfield Pavement Works. Part 4. Bituminous Surfacing
1979
91 pages
Report
No indication
English