A platform for research: civil engineering, architecture and urbanism
Preventive Maintenance Study – Final Report
This final report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill), blade patching, and combinations of dig outs plus crack sealing and dig outs plus full lane chip sealing. The test sites are visited yearly to assess the condition of both the maintenance treatment and the pavements in which they were installed. The cost of the treatments ranged from $1.14 to $19.57 for application on a one foot length of a 12 foot lane. All of the treatments were found to be effective in stabilizing the condition of pavements a minimum of three years and as much as five years, with some of the test sections still in good condition. The stabilization of the pavement’s condition has allowed WSDOT to lengthen the time before rehabilitation and extend pavement life.
Preventive Maintenance Study – Final Report
This final report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill), blade patching, and combinations of dig outs plus crack sealing and dig outs plus full lane chip sealing. The test sites are visited yearly to assess the condition of both the maintenance treatment and the pavements in which they were installed. The cost of the treatments ranged from $1.14 to $19.57 for application on a one foot length of a 12 foot lane. All of the treatments were found to be effective in stabilizing the condition of pavements a minimum of three years and as much as five years, with some of the test sections still in good condition. The stabilization of the pavement’s condition has allowed WSDOT to lengthen the time before rehabilitation and extend pavement life.
Preventive Maintenance Study – Final Report
K. W. Anderson (author) / J. Weston (author) / M. Russell (author) / J. S. Uhlmeyer (author) / K. Willoughby (author) / D. Luhr (author) / C. Fraisure (author)
2018
115 pages
Report
No indication
English
Road Transportation , Transportation & Traffic Planning , Transportation , Construction Management & Techniques , Construction Equipment, Materials, & Supplies , Highway Engineering , Preventive maintenance , Maintenance treatments , Rehabilitation (Maintenance) , Crack sealing , Chip sealing , Wheel path chip sealing , Dig outs , Blade patching , Pavement life
Preventive Maintenance Study – Interim Report
NTIS | 2017
|Wiley | 1969
|Engineering Index Backfile | 1950
|Preventive maintenance program
Engineering Index Backfile | 1957
Online Contents | 2012
|