A platform for research: civil engineering, architecture and urbanism
Development of a Dual-Boom Semi-Automated Roof Bolter
Recognizing the hazards associated with roof bolting in underground coal mines, and the need for improved technology to reduce these hazards, the Bureau of Mines entered into an agreement with contractors to build a production model, second-generation automated bolter that would use the basic technology of remotely controlled single-boom bolters. This report describes a new dual-boom, remotely controlled roof bolter that was designed, fabricated, and tested in an underground coal mine.
Development of a Dual-Boom Semi-Automated Roof Bolter
Recognizing the hazards associated with roof bolting in underground coal mines, and the need for improved technology to reduce these hazards, the Bureau of Mines entered into an agreement with contractors to build a production model, second-generation automated bolter that would use the basic technology of remotely controlled single-boom bolters. This report describes a new dual-boom, remotely controlled roof bolter that was designed, fabricated, and tested in an underground coal mine.
Development of a Dual-Boom Semi-Automated Roof Bolter
C. Hellar (author) / W. Elliott (author) / D. Hamilton (author)
1979
49 pages
Report
No indication
English
Cyclonic anti-floating roof bolter and construction method
European Patent Office | 2022
|Analysis and Research of Hydraulic Roof Bolter in Performance Testing
British Library Conference Proceedings | 2015
|Estimating low back loads of underground mine roof bolter operators using digital human simulations
Automotive engineering | 2004
|