A platform for research: civil engineering, architecture and urbanism
Four(4)-Year Pavement Management Plan: Analysis Report
The 2009-2012 Pavement Management Plan, which was completed last year, provided TxDOT with a mechanism to be able to predict pavement conditions based on a specified funding level and project specific plan. The resulting report consisted of the summary of the number of lane miles that each district planned to treat as Preventive Maintenance (PM), Light, Medium or Heavy Rehabilitation and the impact that those treatments would have on the pavement conditions. This year, the plan has been updated to extend to FY2013 and a similar report generated.
Four(4)-Year Pavement Management Plan: Analysis Report
The 2009-2012 Pavement Management Plan, which was completed last year, provided TxDOT with a mechanism to be able to predict pavement conditions based on a specified funding level and project specific plan. The resulting report consisted of the summary of the number of lane miles that each district planned to treat as Preventive Maintenance (PM), Light, Medium or Heavy Rehabilitation and the impact that those treatments would have on the pavement conditions. This year, the plan has been updated to extend to FY2013 and a similar report generated.
Four(4)-Year Pavement Management Plan: Analysis Report
Z. Zhang (author) / M. R. Murphy (author) / S. Jaipuria (author) / W. Liu (author)
2009
100 pages
Report
No indication
English
Long-term pavement performance : information management system five-year report
UB Braunschweig | 1994
|Pavement management systems : report ...
UB Braunschweig | 1987
|Pavement Quality Indicators Study Five Year Report
NTIS | 2008
|Concrete Pavement Performance: A 23-Year Report
British Library Online Contents | 1992
|