A platform for research: civil engineering, architecture and urbanism
Investigation of Quality Control/Quality Assurance Data to Review Current Specifications for Portland Cement Concrete Pavement Acceptance in Kansas, Technical Summary
This study reviewed KDOT QC/QA data from 24 PCC projects to investigate the effects of statistical level of significance and sample size on pay adjustment. Pay adjustments were calculated based on current KDOT practices and practical performance models (PPMs).
Investigation of Quality Control/Quality Assurance Data to Review Current Specifications for Portland Cement Concrete Pavement Acceptance in Kansas, Technical Summary
This study reviewed KDOT QC/QA data from 24 PCC projects to investigate the effects of statistical level of significance and sample size on pay adjustment. Pay adjustments were calculated based on current KDOT practices and practical performance models (PPMs).
Investigation of Quality Control/Quality Assurance Data to Review Current Specifications for Portland Cement Concrete Pavement Acceptance in Kansas, Technical Summary
S. Islam (author) / X. Wu (author) / M. Hossain (author)
2018
2 pages
Report
No indication
English
Recycled Portland Cement Concrete "Specifications and Quality Control"
British Library Conference Proceedings | 1981
|