A platform for research: civil engineering, architecture and urbanism
City of Idaho Falls Hydroelectric Demonstration Project: Final Technical and Construction Cost Report. Small-Scale Hydroelectric Power Demonstration Project
The construction of the Idaho Falls Low-Head Hydroelectric Demonstration Project is summarized. The demonstration project consists of the redevelopment of three existing power plants using bulb turbines and generators. The following are discussed: procurement contracts; preparation of upper plant site; general construction; installation of turbines and generators, mechanical equipment, and electrical equipment; and engineering and construction management. Included in appendices are cost, general construction cost, concrete cylinders test results, and engineering drawings. (ERA citation 08:038604)
City of Idaho Falls Hydroelectric Demonstration Project: Final Technical and Construction Cost Report. Small-Scale Hydroelectric Power Demonstration Project
The construction of the Idaho Falls Low-Head Hydroelectric Demonstration Project is summarized. The demonstration project consists of the redevelopment of three existing power plants using bulb turbines and generators. The following are discussed: procurement contracts; preparation of upper plant site; general construction; installation of turbines and generators, mechanical equipment, and electrical equipment; and engineering and construction management. Included in appendices are cost, general construction cost, concrete cylinders test results, and engineering drawings. (ERA citation 08:038604)
City of Idaho Falls Hydroelectric Demonstration Project: Final Technical and Construction Cost Report. Small-Scale Hydroelectric Power Demonstration Project
1983
260 pages
Report
No indication
English