A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase 1, Inspection Report
The dam is a gravel and clay fill embankment about 340 feet long with a maximum height of about 11 feet and a top width averaging 80 feet. The dam appears to be in fair condition. The upstream slope and crest are well maintained. It has a classification of small in size and a significant hazard potential. The owner should retain the services of a registered professional engineer for various purposes.
National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase 1, Inspection Report
The dam is a gravel and clay fill embankment about 340 feet long with a maximum height of about 11 feet and a top width averaging 80 feet. The dam appears to be in fair condition. The upstream slope and crest are well maintained. It has a classification of small in size and a significant hazard potential. The owner should retain the services of a registered professional engineer for various purposes.
National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase 1, Inspection Report
1980
53 pages
Report
No indication
English