A platform for research: civil engineering, architecture and urbanism
SR 99, Duwamish River Crossing, Washington
Construction is proposed of a 5-lane bascule bridge clearing a 200-foot wide waterway channel in Seattle, Washington. An unavoidable adverse effect will be the limitation of the navigable width of the channel.
SR 99, Duwamish River Crossing, Washington
Construction is proposed of a 5-lane bascule bridge clearing a 200-foot wide waterway channel in Seattle, Washington. An unavoidable adverse effect will be the limitation of the navigable width of the channel.
SR 99, Duwamish River Crossing, Washington
1972
64 pages
Report
No indication
English
Seismic stability of the Duwamish River Delta, Seattle, Washington
British Library Conference Proceedings | 1998
|Seattle's semi-buoyant bridge over Duwamish river
Engineering Index Backfile | 1955
|Seattle: Improving the Lower Duwamish River Area
British Library Online Contents | 2017
|Seattle's semi-buoyant bridge over Duwamish river
Engineering Index Backfile | 1955
|New utilidor under the Duwamish
Online Contents | 1995
|