A platform for research: civil engineering, architecture and urbanism
Design changes delaying Foinaven FPSO - Delays caused by design changes to the Golar Nor-designed Foinaven FPSO have prevented the vessel coming onstream this summer as planned.
Design changes delaying Foinaven FPSO - Delays caused by design changes to the Golar Nor-designed Foinaven FPSO have prevented the vessel coming onstream this summer as planned.
Design changes delaying Foinaven FPSO - Delays caused by design changes to the Golar Nor-designed Foinaven FPSO have prevented the vessel coming onstream this summer as planned.
Offshore ; 56
1996
Article (Journal)
English
Online Contents | 1998
DEEPWATER PRODUCTION - Foinaven pushing deepwater envelope
Online Contents | 1997
Online Contents | 1997
FLOATING PRODUCTION Test tree enables fast development of Foinaven
Online Contents | 1995
Foinaven to see first deep water 4D seismic
Online Contents | 1995