A platform for research: civil engineering, architecture and urbanism
RÉPARATION D'OUVRAGES - The Channel Tunnel repaired in 60 days
RÉPARATION D'OUVRAGES - The Channel Tunnel repaired in 60 days
RÉPARATION D'OUVRAGES - The Channel Tunnel repaired in 60 days
Pins, Ph de (author) / Zanker, Ph / Demorieux, J.-M.
1998
Article (Journal)
French
RÉPARATION D'OUVRAGES - Renovation of the Fourvière tunnel. Civil engineering and structural masonry
Online Contents | 1998
|The Channel Tunnel repaired in 60 days
British Library Online Contents | 1998
|