A platform for research: civil engineering, architecture and urbanism
8,000-ton deck floatover planned for Gulf - Saipem will mate and deck and base on an unidentified field in the year 2000, using the firm's Anteo floatover system.
8,000-ton deck floatover planned for Gulf - Saipem will mate and deck and base on an unidentified field in the year 2000, using the firm's Anteo floatover system.
8,000-ton deck floatover planned for Gulf - Saipem will mate and deck and base on an unidentified field in the year 2000, using the firm's Anteo floatover system.
Offshore ; 19980
Article (Journal)
English
Technip Makes Unprecedented Floatover . Topside Installation Off Malaysia
Online Contents | 2007
Offshore Platform Integration and Floatover Technology
UB Braunschweig | 2017
|