A platform for research: civil engineering, architecture and urbanism
SPECIAL REPORT: Spotlight on Belleville Hydro Project Belleville: 42 Municipalities Seeking Long-Term Stability - In the late 1980s, a group of Ohio municipalities banded together in a joint venture that has now ensured them of a long-term source of clean, renewable electric power
SPECIAL REPORT: Spotlight on Belleville Hydro Project Belleville: 42 Municipalities Seeking Long-Term Stability - In the late 1980s, a group of Ohio municipalities banded together in a joint venture that has now ensured them of a long-term source of clean, renewable electric power
SPECIAL REPORT: Spotlight on Belleville Hydro Project Belleville: 42 Municipalities Seeking Long-Term Stability - In the late 1980s, a group of Ohio municipalities banded together in a joint venture that has now ensured them of a long-term source of clean, renewable electric power
Meier, Philip E. (author)
Hydro review ; 18
1999
Article (Journal)
English
Belleville: 42 Municipalities Seeking Long-Term Stability
British Library Online Contents | 1999
|Online Contents | 1995
|TIBKAT | 1988
|Online Contents | 1989
|Navigation conditions at Belleville Locks and dam, Ohio River
Engineering Index Backfile | 1966
|