A platform for research: civil engineering, architecture and urbanism
FABRICATION-ASSEMBLY METHODS - Giant decks installed by floatover - Floatovers mate 11,500 ton and 14,000 ton Bayu-Undan decks to steel jackets in Timor Gap.
FABRICATION-ASSEMBLY METHODS - Giant decks installed by floatover - Floatovers mate 11,500 ton and 14,000 ton Bayu-Undan decks to steel jackets in Timor Gap.
FABRICATION-ASSEMBLY METHODS - Giant decks installed by floatover - Floatovers mate 11,500 ton and 14,000 ton Bayu-Undan decks to steel jackets in Timor Gap.
Offshore ; 60
2000
Article (Journal)
English
NORWAY IN SOUTHEAST ASIA - Semco gets Bayu-Undan order
Online Contents | 2000
TIBKAT | 1974
Post-Installed Adhesive-Bonded Splices in Bridge Decks
NTIS | 2002
|TIBKAT | 1990
|