A platform for research: civil engineering, architecture and urbanism
The LP-IP hybrid method for construction time-cost trade-off analysis
The LP-IP hybrid method for construction time-cost trade-off analysis
The LP-IP hybrid method for construction time-cost trade-off analysis
Burns, S.A. (author) / Liu, L. / Feng, C.-W.
1996
Article (Journal)
Unknown
Local classification TIB:
275/1935/6500
BKL:
56.00
/
56.00
Bauwesen: Allgemeines
Construction Time-Cost Trade-Off Analysis Using LP-IP Hybrid Method
Online Contents | 1995
|Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method
British Library Online Contents | 1995
|The LP/IP hybrid method for construction time-cost trade-off analysis
British Library Online Contents | 1996
|The LP/IP hybrid method for construction time-cost trade-off analysis
Taylor & Francis Verlag | 1996
|Stochastic Construction Time-Cost Trade-Off Analysis
British Library Online Contents | 2000
|