A platform for research: civil engineering, architecture and urbanism
FEATURE ARTICLES - Rebuilding the Water Conveyance System at Schaghticoke Hydro - Localized corrosion caused a penstock to rupture, with the ensuing torrent of water damaging a 90-year-old hydro plant. Working simultaneously, the design, peer review, and construction teams rebuilt the project's water conveyance system eight months ahead of schedule.
FEATURE ARTICLES - Rebuilding the Water Conveyance System at Schaghticoke Hydro - Localized corrosion caused a penstock to rupture, with the ensuing torrent of water damaging a 90-year-old hydro plant. Working simultaneously, the design, peer review, and construction teams rebuilt the project's water conveyance system eight months ahead of schedule.
FEATURE ARTICLES - Rebuilding the Water Conveyance System at Schaghticoke Hydro - Localized corrosion caused a penstock to rupture, with the ensuing torrent of water damaging a 90-year-old hydro plant. Working simultaneously, the design, peer review, and construction teams rebuilt the project's water conveyance system eight months ahead of schedule.
Viau, Joseph L. (author)
Hydro review ; 20
2001
Article (Journal)
English
Rebuilding the Water Conveyance System at Schaghticoke Hydro
British Library Online Contents | 2001
|BOUNDARY WATER-CONVEYANCE BLOCK AND WATER-CONVEYANCE STRUCTURE USING BOUNDARY WATER-CONVEYANCE BLOCK
European Patent Office | 2020
|