A platform for research: civil engineering, architecture and urbanism
Redeveloping and Operating a Hydra Facility: Experience at Iroquois Falls - Abitibi-Consolidated decided to update its 16-MW Iroquois Falls hydroelectric plant to maximize electricity production for its paper mill. The redevelopment gave Abitibi a gain of 13.5 MW of capacity, as well as 51 gigawatt-hours more electricity production each year.
Redeveloping and Operating a Hydra Facility: Experience at Iroquois Falls - Abitibi-Consolidated decided to update its 16-MW Iroquois Falls hydroelectric plant to maximize electricity production for its paper mill. The redevelopment gave Abitibi a gain of 13.5 MW of capacity, as well as 51 gigawatt-hours more electricity production each year.
Redeveloping and Operating a Hydra Facility: Experience at Iroquois Falls - Abitibi-Consolidated decided to update its 16-MW Iroquois Falls hydroelectric plant to maximize electricity production for its paper mill. The redevelopment gave Abitibi a gain of 13.5 MW of capacity, as well as 51 gigawatt-hours more electricity production each year.
Mantha, Marc A. (author)
Hydro review ; 24
2005
Article (Journal)
English
Redeveloping and Operating a Hydro Facility: Experience at Iroquois Falls
British Library Online Contents | 2005
|Planning the industrial town of iroquois falls, Ontario
Engineering Index Backfile | 1916
|Engineering Index Backfile | 1904
|Structural changes in the hotel iroquois
Engineering Index Backfile | 1900