A platform for research: civil engineering, architecture and urbanism
REPAIR AND STRENGTHENING - Rehabilitation of the Matthew Murray Tunnel
REPAIR AND STRENGTHENING - Rehabilitation of the Matthew Murray Tunnel
REPAIR AND STRENGTHENING - Rehabilitation of the Matthew Murray Tunnel
Deller, Philip (author)
Concrete ; 39
2005
Article (Journal)
English
Local classification TIB:
275/6400/6500
BKL:
56.12
Betonbau
Rehabilitation of the Matthew Murray Tunnel
British Library Online Contents | 2005
|STRENGTHENING AND REPAIR - Hopkins and Clinton Street Bridges rehabilitation case study
Online Contents | 2006
|REPAIR AND STRENGTHENING - Repair and strengthening of large structures
Online Contents | 2007
|Bridge strengthening and rehabilitation
TIBKAT | 1996
|