A platform for research: civil engineering, architecture and urbanism
TOP 5 PROJECTS - BBLT brings firsts to Angola, industry - Chevron completed the (USD)2.3-billion Benguela-Belize-Lobito-Tombocco (BBLT) compliant tower offshore Angola ahead of schedule and within budget on Jan. 24, 2006. The BBLT structure, a compliant piled tower (CPT) with topsides weighing over 40,000 tons, is situated in 396 m (1,300 ft) of water in block 14.
TOP 5 PROJECTS - BBLT brings firsts to Angola, industry - Chevron completed the (USD)2.3-billion Benguela-Belize-Lobito-Tombocco (BBLT) compliant tower offshore Angola ahead of schedule and within budget on Jan. 24, 2006. The BBLT structure, a compliant piled tower (CPT) with topsides weighing over 40,000 tons, is situated in 396 m (1,300 ft) of water in block 14.
TOP 5 PROJECTS - BBLT brings firsts to Angola, industry - Chevron completed the (USD)2.3-billion Benguela-Belize-Lobito-Tombocco (BBLT) compliant tower offshore Angola ahead of schedule and within budget on Jan. 24, 2006. The BBLT structure, a compliant piled tower (CPT) with topsides weighing over 40,000 tons, is situated in 396 m (1,300 ft) of water in block 14.
Offshore ; 66
2006
Article (Journal)
English
Benguela-Belize Compliant Piled Tower: Tower Design
British Library Conference Proceedings | 2006
|Benguela-Belize Compliant Piled Tower: Tower Fabrication
British Library Conference Proceedings | 2006
|Benguela-Belize Compliant Piled Tower: Installation
British Library Conference Proceedings | 2006
|Benguela-Belize Compliant Piled Tower: Topside Engineering
British Library Conference Proceedings | 2006
|