A platform for research: civil engineering, architecture and urbanism
Jubarte field opens Petrobras' pre-salt production - A milestone for the Brazilian oil industry, first production from pre-salt layer, kicked-off this past Sept. 2 in Jubarte field, north of Campos basin, in 1,323 m (4,341 ft) water depth, some 77 km (48 mi) off the southern coast of Espirito Santo state on BC-60 block.
Jubarte field opens Petrobras' pre-salt production - A milestone for the Brazilian oil industry, first production from pre-salt layer, kicked-off this past Sept. 2 in Jubarte field, north of Campos basin, in 1,323 m (4,341 ft) water depth, some 77 km (48 mi) off the southern coast of Espirito Santo state on BC-60 block.
Jubarte field opens Petrobras' pre-salt production - A milestone for the Brazilian oil industry, first production from pre-salt layer, kicked-off this past Sept. 2 in Jubarte field, north of Campos basin, in 1,323 m (4,341 ft) water depth, some 77 km (48 mi) off the southern coast of Espirito Santo state on BC-60 block.
Offshore ; 68
2008
Article (Journal)
English
Espirito Santo do Cerrado Church
British Library Online Contents | 1999
|Espirito Santo do Cerrado Church
Online Contents | 1999
|Espirito Santo Plaza, Miami, Florida
British Library Online Contents | 2003
|Structures in North America - Espirito Santo Plaza, Miami, Florida
Online Contents | 2003
|