A platform for research: civil engineering, architecture and urbanism
RECONNECTED - The engineers hired to replace a bridge over Biloxi Bay after it was destroyed by Hurricane Katrina faced a daunting task: Ensuring that one lane of the new bridge would be open in each direction in just 18 months and that the entire bridge, which was to carry three lanes in each direction, would be open in less than two years. Using carefully designed structural elements that could be easily manufactured and the design-build delivery method, they beat the initial deadline by two months.
RECONNECTED - The engineers hired to replace a bridge over Biloxi Bay after it was destroyed by Hurricane Katrina faced a daunting task: Ensuring that one lane of the new bridge would be open in each direction in just 18 months and that the entire bridge, which was to carry three lanes in each direction, would be open in less than two years. Using carefully designed structural elements that could be easily manufactured and the design-build delivery method, they beat the initial deadline by two months.
RECONNECTED - The engineers hired to replace a bridge over Biloxi Bay after it was destroyed by Hurricane Katrina faced a daunting task: Ensuring that one lane of the new bridge would be open in each direction in just 18 months and that the entire bridge, which was to carry three lanes in each direction, would be open in less than two years. Using carefully designed structural elements that could be easily manufactured and the design-build delivery method, they beat the initial deadline by two months.
Cassity, Patrick (author)
Civil engineering ; 79
2009
Article (Journal)
English
British Library Online Contents | 2009
|Focus - Biloxi Bay Bridge, Biloxi, Miss.
Online Contents | 2009
BRIDGE BEARING STRUCTURE FOR EASILY RECOGNIZED DIRECTION
European Patent Office | 2018
|Building the new Biloxi bridge
Engineering Index Backfile | 1929
US 90 Bridge Over Biloxi Bay-A Design-Build Solution to Katrina Recovery
British Library Conference Proceedings | 2008
|