A platform for research: civil engineering, architecture and urbanism
New CSXT, CN railroad bridges smooth traffic at MSU - Michigan State needed to free up Farm Lane at the south end of campus, which involved two new railroad bridges on CN and CSXT to eliminate grade crossings.
New CSXT, CN railroad bridges smooth traffic at MSU - Michigan State needed to free up Farm Lane at the south end of campus, which involved two new railroad bridges on CN and CSXT to eliminate grade crossings.
New CSXT, CN railroad bridges smooth traffic at MSU - Michigan State needed to free up Farm Lane at the south end of campus, which involved two new railroad bridges on CN and CSXT to eliminate grade crossings.
2009
Article (Journal)
English
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1889
|Survey railroad crossings at grade for traffic delays
Engineering Index Backfile | 1957
ASCE | 2021
|