A platform for research: civil engineering, architecture and urbanism
Determining an Optimal Plan for an Upgrade at Ludington - To determine the work required to rehabilitate and upgrade the pump-turbines at the 1,872-MW Ludington plant, Consumers Energy and Detroit Edison undertook a comprehensive condition assessment and life extension study. The information was used to develop an optimal upgrade plan.
Determining an Optimal Plan for an Upgrade at Ludington - To determine the work required to rehabilitate and upgrade the pump-turbines at the 1,872-MW Ludington plant, Consumers Energy and Detroit Edison undertook a comprehensive condition assessment and life extension study. The information was used to develop an optimal upgrade plan.
Determining an Optimal Plan for an Upgrade at Ludington - To determine the work required to rehabilitate and upgrade the pump-turbines at the 1,872-MW Ludington plant, Consumers Energy and Detroit Edison undertook a comprehensive condition assessment and life extension study. The information was used to develop an optimal upgrade plan.
Topper, James L (author) / Axdorff, William J / Sonntag, David J / Rittase, Robert A
Hydro review ; 30
2011
Article (Journal)
English
Determining an Optimal Plan for an Upgrade at Ludington
British Library Online Contents | 2011
|Ludington #5 site Overhaul Of A Large Pump/Turbine
British Library Conference Proceedings | 1993
|Major Overhaul Boosts Performance at Ludington Pumped-Storage Plant
British Library Online Contents | 2016
|Ludington Pumped Storage Plant: - Ready To Fulfill Its Destiny
Online Contents | 1997
|Ludington Pumped Storage Plant: Ready To Fulfill Its Destiny
British Library Online Contents | 1997
|