A platform for research: civil engineering, architecture and urbanism
Construction and Geometry Control of Incheon Cable-Stayed Bridge
Construction and Geometry Control of Incheon Cable-Stayed Bridge
Construction and Geometry Control of Incheon Cable-Stayed Bridge
Yang, Jong-Ho (author) / Im, Duk-Ki / Kim, Chang-Hyun / Ahn, Sang-Sup / Lee, Wan-Soo
2012
Article (Journal)
German
BKL:
56.10
Ingenieurhochbau: Allgemeines
/
56.23
Brückenbau
Local classification TIB:
645/6510/6530
Construction and Geometry Control of Incheon Cable-Stayed Bridge
British Library Online Contents | 2012
|Integrated geometry control system for cable stayed bridge: Application to Incheon bridge
British Library Conference Proceedings | 2010
|Geometry control for the concrete pylon of Incheon Cable Stayed Bridge
British Library Conference Proceedings | 2008
|British Library Conference Proceedings | 2008
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|