A platform for research: civil engineering, architecture and urbanism
McEwen reports positive feasibility study for gold bar
Operating costs were estimated based on process design criteria, equipment lease rates, labor, reagents, on-site power generation, fuel, explosives, maintenance, and other miscellaneous costs.
McEwen reports positive feasibility study for gold bar
Operating costs were estimated based on process design criteria, equipment lease rates, labor, reagents, on-site power generation, fuel, explosives, maintenance, and other miscellaneous costs.
McEwen reports positive feasibility study for gold bar
2015
Article (Journal)
English
Online Contents | 2016
Online Contents | 2016
Online Contents | 2016
Online Contents | 2015
Online Contents | 2016