A platform for research: civil engineering, architecture and urbanism
Eldorado advancing Greek and Romanian gold projects
Certej: A recently completed feasibility study supports development of the Certej project as an open-pit mine and pressure oxidation processing plant producing an average of 140,000 oz/y of gold and 830,000 oz/y of silver in a gold-silver doré over an operating life of about 15 years. The oxidized solids will be treated with limestone and lime at elevated temperatures to facilitate silver recovery, prior to conventional precious metal recovery by carbon-in-leach cyanidation, carbon stripping, and electrowinning.
Eldorado advancing Greek and Romanian gold projects
Certej: A recently completed feasibility study supports development of the Certej project as an open-pit mine and pressure oxidation processing plant producing an average of 140,000 oz/y of gold and 830,000 oz/y of silver in a gold-silver doré over an operating life of about 15 years. The oxidized solids will be treated with limestone and lime at elevated temperatures to facilitate silver recovery, prior to conventional precious metal recovery by carbon-in-leach cyanidation, carbon stripping, and electrowinning.
Eldorado advancing Greek and Romanian gold projects
2015
Article (Journal)
English
Eldorado Gold completes Tocantinzinho feasibility study
Online Contents | 2015
Eldorado Gold Set to Acquire Sino Gold for $2B
Online Contents | 2009
Online Contents | 2012
|Dubai -- Eldorado für Bauleute
Online Contents | 2008
Online Contents | 1996