A platform for research: civil engineering, architecture and urbanism
North American Palladium cuts workforce at Lac des Iles
Due to the reduction in low-grade material being processed at Lac des Iles and the impact of a temporary mill shutdown earlier in 2015 as a result of water balance issues, North American Palladium has revised its 2015 production guidance to 160,000 to 170.000 oz of palladium, down from a previous forecast of 185,000 to 205,000 oz.
North American Palladium cuts workforce at Lac des Iles
Due to the reduction in low-grade material being processed at Lac des Iles and the impact of a temporary mill shutdown earlier in 2015 as a result of water balance issues, North American Palladium has revised its 2015 production guidance to 160,000 to 170.000 oz of palladium, down from a previous forecast of 185,000 to 205,000 oz.
North American Palladium cuts workforce at Lac des Iles
2015
Article (Journal)
English
British Library Online Contents | 2003
Gurit cuts workforce in Canada
British Library Online Contents | 2009