A platform for research: civil engineering, architecture and urbanism
An Econometric Analysis of Holdup Problems in Construction Projects
AbstractThe holdup problem plays a central role in explaining governance choices in general and project delivery system selection in particular. This problem arises because of the asymmetrical distribution of quasi-rents between two trading parties. To put this theoretical proposition to a direct test, this research first uses the Nash bargaining model to derive a hypothesis that links quasi-rent differences to the excess profit margin that the contractor can achieve in ex post negotiations, and then collates a data set of 62 change-order cases to enable the hypothesis to be tested econometrically. The corroboration of the hypothesis lends empirical support to the core argument used in the analysis of construction holdup problems. This finding brings to the foreground the significance of recognizing that change orders might be attributed to the owner’s strategic choice. Ignorance of this factor would bias the coefficient estimation in the empirical analysis of change orders.
An Econometric Analysis of Holdup Problems in Construction Projects
AbstractThe holdup problem plays a central role in explaining governance choices in general and project delivery system selection in particular. This problem arises because of the asymmetrical distribution of quasi-rents between two trading parties. To put this theoretical proposition to a direct test, this research first uses the Nash bargaining model to derive a hypothesis that links quasi-rent differences to the excess profit margin that the contractor can achieve in ex post negotiations, and then collates a data set of 62 change-order cases to enable the hypothesis to be tested econometrically. The corroboration of the hypothesis lends empirical support to the core argument used in the analysis of construction holdup problems. This finding brings to the foreground the significance of recognizing that change orders might be attributed to the owner’s strategic choice. Ignorance of this factor would bias the coefficient estimation in the empirical analysis of change orders.
An Econometric Analysis of Holdup Problems in Construction Projects
Chang, Chen-Yu (author) / Qian, Yaming
2015
Article (Journal)
English
Predicting construction market growth for urban metropolis: An econometric analysis
Online Contents | 2011
|Forecasting Construction Manpower Demand: An Econometric Model
British Library Conference Proceedings | 2009
|Design–Construction Interface Problems in Sustainable Construction Projects
ASCE | 2025
|