A platform for research: civil engineering, architecture and urbanism
Building Better Floors
the panel cups as the panel edges move higher than the panel centerline. The first slab was placed on July 30, 2014, and the last was placed on September 11, 2014. Because of the size of the placements and the extreme daytime temperatures, all concrete placements took place at night, beginning at 3:00 a.m. While the nighttime weather in the California desert is typically cool with no appreciable wind, conditions change dramatically as the sun rises.
Building Better Floors
the panel cups as the panel edges move higher than the panel centerline. The first slab was placed on July 30, 2014, and the last was placed on September 11, 2014. Because of the size of the placements and the extreme daytime temperatures, all concrete placements took place at night, beginning at 3:00 a.m. While the nighttime weather in the California desert is typically cool with no appreciable wind, conditions change dramatically as the sun rises.
Building Better Floors
Jack Gibbons (author) / Joe Nasvik
2016
Article (Journal)
English
Engineering Index Backfile | 1939
|FLOORS AND SCREEDS - Better books on floors: Concrete Bookshop News
Online Contents | 2001
White cement floors for better light
Engineering Index Backfile | 1942
White cement floors for better light
Engineering Index Backfile | 1943
Researching Warehouse Floors - Constructing a better floor
Online Contents | 2009