A platform for research: civil engineering, architecture and urbanism
Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level
AbstractThis paper presents an optimization model for scheduling railway ballast, rail, and sleeper renewal operations at a network level. The objective of the model is to minimize the expected railway track life-cycle cost (LCC) and track unavailability costs derived from user impacts caused by traffic disruption during track renewal operations. To minimize costs, the model assesses the opportunistic renewal of railway track components and takes advantage of planning from a network perspective to study the possibility of reusing track components on different lines. The practical utility of the model is illustrated with a case study involving the Portuguese railway network. The results indicate that user costs have an important influence on decision making in the track renewal process and that the network perspective of renewal planning can reduce the direct costs of these operations.
Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level
AbstractThis paper presents an optimization model for scheduling railway ballast, rail, and sleeper renewal operations at a network level. The objective of the model is to minimize the expected railway track life-cycle cost (LCC) and track unavailability costs derived from user impacts caused by traffic disruption during track renewal operations. To minimize costs, the model assesses the opportunistic renewal of railway track components and takes advantage of planning from a network perspective to study the possibility of reusing track components on different lines. The practical utility of the model is illustrated with a case study involving the Portuguese railway network. The results indicate that user costs have an important influence on decision making in the track renewal process and that the network perspective of renewal planning can reduce the direct costs of these operations.
Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level
Teixeira, Paulo Fonseca (author) / Caetano, Luis Filipe
2016
Article (Journal)
English
Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level
Online Contents | 2016
|Availability Approach to Optimizing Railway Track Renewal Operations
Online Contents | 2013
|Optimisation model to schedule railway track renewal operations: a life-cycle cost approach
Taylor & Francis Verlag | 2015
|