A platform for research: civil engineering, architecture and urbanism
Oyu Tolgoi sets quarterly record
Turquoise Hill Resources announced third-quarter production for Oyu Tolgoi, which included setting an all-time high record for quarterly material mined of more than 25 million metric tons (mt). This record includes stripping for Phase 4, which is the next area of high-grade ore. In the third quarter, concentrator throughput declined 4% over the second quarter due to planned maintenance and conveyor belt repairs. Copper production declined 9.9% over the second quarter as a result of lower recovery from Phase 6 ore. As expected, gold production declined 47.1% over the second quarter due to lower grades from the completion of mining Phase 2.
Oyu Tolgoi sets quarterly record
Turquoise Hill Resources announced third-quarter production for Oyu Tolgoi, which included setting an all-time high record for quarterly material mined of more than 25 million metric tons (mt). This record includes stripping for Phase 4, which is the next area of high-grade ore. In the third quarter, concentrator throughput declined 4% over the second quarter due to planned maintenance and conveyor belt repairs. Copper production declined 9.9% over the second quarter as a result of lower recovery from Phase 6 ore. As expected, gold production declined 47.1% over the second quarter due to lower grades from the completion of mining Phase 2.
Oyu Tolgoi sets quarterly record
2016
Article (Journal)
English
Oyu Tolgoi production on target
Online Contents | 2016
Oyu Tolgoi reaches product milestone
Online Contents | 2015
Asia: Oyu Tolgoi Construction 70% Complete
Online Contents | 2012
Asia: Oyu Tolgoi Produces First Concentrate
Online Contents | 2013
Asia: Oyu Tolgoi Gets Investment Agreement
Online Contents | 2009
|