A platform for research: civil engineering, architecture and urbanism
Waterberg PFS considers 744.000 oz/y PGM production
Platinum Group Metals Ltd has reported positive results from an independent prefeasibility study (PFS) of the Waterberg platinum group metals project at the northern end of the Northern Limb of the Bushveld Complex in South Africa. Platinum Group Metals holds a 58.62% effective interest in the project; Japan Oil Gas and Metals National Corp holds 28.35%; and empowerment partner Mnombo Wethu Consultants holds the remainder. The PFS considers development of a large, shallow, decline-accessible, mechanized mine producing 744,000 ounces per year (oz/y) of platinum, palladium, rhodium, and gold in concentrate (222,000 oz/y of platinum, 472,000 oz/y of palladium, 6,000 oz/y of rhodium, and 45,000 oz/y of gold.)
Waterberg PFS considers 744.000 oz/y PGM production
Platinum Group Metals Ltd has reported positive results from an independent prefeasibility study (PFS) of the Waterberg platinum group metals project at the northern end of the Northern Limb of the Bushveld Complex in South Africa. Platinum Group Metals holds a 58.62% effective interest in the project; Japan Oil Gas and Metals National Corp holds 28.35%; and empowerment partner Mnombo Wethu Consultants holds the remainder. The PFS considers development of a large, shallow, decline-accessible, mechanized mine producing 744,000 ounces per year (oz/y) of platinum, palladium, rhodium, and gold in concentrate (222,000 oz/y of platinum, 472,000 oz/y of palladium, 6,000 oz/y of rhodium, and 45,000 oz/y of gold.)
Waterberg PFS considers 744.000 oz/y PGM production
2016
Article (Journal)
English
Platinum Group Metals reports on Waterberg DFS
Online Contents | 2017
12 Rigs drilling on the Waterberg joint-venture project
Online Contents | 2016
Court Considers Conflicting Provisions
ASCE | 2016
|Buffalo Coal considers restructuring
Online Contents | 2015