A platform for research: civil engineering, architecture and urbanism
Production Begins at Doris
TMAC Resources announced that commercial production was achieved on May 15 at its Doris mine and mill complex situated on the company's Hope Bay property located in the Kitikmeot region of Nunavut, Canada. The processing plant has operated at an average in excess of 60% of its 1,000-metric4on-per-day (mt/d) nameplate capacity for more than a 45-day period, and at an average of more than 80% of capacity from May 4-15.
Production Begins at Doris
TMAC Resources announced that commercial production was achieved on May 15 at its Doris mine and mill complex situated on the company's Hope Bay property located in the Kitikmeot region of Nunavut, Canada. The processing plant has operated at an average in excess of 60% of its 1,000-metric4on-per-day (mt/d) nameplate capacity for more than a 45-day period, and at an average of more than 80% of capacity from May 4-15.
Production Begins at Doris
2017
Article (Journal)
English
Online Contents | 2001
|Online Contents | 2021
|DORIS Contribution to ITRF2005
Online Contents | 2006
|DORIS Contribution to ITRF2005
Online Contents | 2006
|TIBKAT | 2012
|