A platform for research: civil engineering, architecture and urbanism
Nornickel completes 30% expansion of Talnakh nickel-copper concentrator
Norilsk Nickel (Nornickel) has completed commissioning of a 30% expansion of throughput capacity and modernization of the Talnakh concentrator at its Polar division in north-central Russia. Total through-put capacity has increased from 7.6 million to 10.2 million mt/y of ore; target nickel and copper recovery rates and the target quality of nickel-pyrrhotite and copper concentrates have been reached; and metal losses to tailings have been reduced. The plant is meeting its metal production targets while utilizing less smelting capacity.
Nornickel completes 30% expansion of Talnakh nickel-copper concentrator
Norilsk Nickel (Nornickel) has completed commissioning of a 30% expansion of throughput capacity and modernization of the Talnakh concentrator at its Polar division in north-central Russia. Total through-put capacity has increased from 7.6 million to 10.2 million mt/y of ore; target nickel and copper recovery rates and the target quality of nickel-pyrrhotite and copper concentrates have been reached; and metal losses to tailings have been reduced. The plant is meeting its metal production targets while utilizing less smelting capacity.
Nornickel completes 30% expansion of Talnakh nickel-copper concentrator
2017
Article (Journal)
English
Rock bursts in mines of Talnakh complex deposits - Prediction and prevention
British Library Conference Proceedings | 1993
|British Library Online Contents | 2005
Amitech completes Sao Paulo expansion
British Library Online Contents | 2008
Mountain Fuel Gas Completes Expansion, Replacements
Online Contents | 1993
Atlantic wire company completes annealing expansion
Engineering Index Backfile | 1943