A platform for research: civil engineering, architecture and urbanism
Contractor: Shuttered Mine Re-opened in 9 Weeks
Engineering contractor Chute Technology announced timely and successful rehabilitation and recommissioning of Glencore's Integra Coal mine in Hunter Valley.Afterward, the mine was reported to be on schedule to deliver first coal from the longwall by midyear and building workforce numbers, Chute Technology reported.
Contractor: Shuttered Mine Re-opened in 9 Weeks
Engineering contractor Chute Technology announced timely and successful rehabilitation and recommissioning of Glencore's Integra Coal mine in Hunter Valley.Afterward, the mine was reported to be on schedule to deliver first coal from the longwall by midyear and building workforce numbers, Chute Technology reported.
Contractor: Shuttered Mine Re-opened in 9 Weeks
2017
Article (Journal)
English
Underground Station shuttered with standard Elements
British Library Online Contents | 1999
Close Calls: Deciding how to rejuvenate shuttered schools
British Library Online Contents | 2010
Contractor Uses Portable Dredge to Mine Sand
Online Contents | 1996
British Library Online Contents | 2001