A platform for research: civil engineering, architecture and urbanism
Sibanye-Stillwater Begins Processing Blitz Ore
Sibanye-Stillwater began processing palladium- platinum ore from its Blitz project adjacent to its underground Stillwater mine in south-central Montana on September 29. Completion of a secondary escape-way system at the Blitz 10 stope block concluded the final infrastructure required for production to begin. Approximately 1,360 mt of ore excavated during Blitz development and stockpiled on the surface is now being processed. Based on muck sampling along the entire 115 ft of ore width intersected within the stope block, the initial cut delivered ore with an estimated average palladium-platinum grade of 39 grams per metric ton.
Sibanye-Stillwater Begins Processing Blitz Ore
Sibanye-Stillwater began processing palladium- platinum ore from its Blitz project adjacent to its underground Stillwater mine in south-central Montana on September 29. Completion of a secondary escape-way system at the Blitz 10 stope block concluded the final infrastructure required for production to begin. Approximately 1,360 mt of ore excavated during Blitz development and stockpiled on the surface is now being processed. Based on muck sampling along the entire 115 ft of ore width intersected within the stope block, the initial cut delivered ore with an estimated average palladium-platinum grade of 39 grams per metric ton.
Sibanye-Stillwater Begins Processing Blitz Ore
2017
Article (Journal)
English
BLITZ-ÜBERSPANNUNG Blitz-Informationsdienst zeigt den Blitz und mehr
Online Contents | 2000
|Blitz-Überspannung - Schäden durch Blitz und Überspannung II
Online Contents | 2008
|Stillwater Dam Rehabilitation Project
British Library Conference Proceedings | 1992
|Upper Stillwater Dam Crack Repair
British Library Conference Proceedings | 2006
|Blitz-Überspannung - Schäden durch Blitz und Überspannung
Online Contents | 2007
|