A platform for research: civil engineering, architecture and urbanism
Heuristic approaches for mine planning and production scheduling
Summary Traditional methods and opimization methods for mine planning and production scheduling have failed to provide easy to use tools that yield improved results. Two new approaches, each combining the best of the traditional and the optimization, are described.
Heuristic approaches for mine planning and production scheduling
Summary Traditional methods and opimization methods for mine planning and production scheduling have failed to provide easy to use tools that yield improved results. Two new approaches, each combining the best of the traditional and the optimization, are described.
Heuristic approaches for mine planning and production scheduling
Gershon, Mark (author)
1987
Article (Journal)
English
BKL:
38.58
Geomechanik
/
57.00
Bergbau: Allgemeines
/
56.20
Ingenieurgeologie, Bodenmechanik
Local classification TIB:
275/3730/4800
Optimal mine production scheduling: evaluation of large scale mathematical programming approaches
Online Contents | 1983
|Heuristic scheduling of multiple smart home appliances: Utility planning perspective
BASE | 2016
|An Heuristic Architectural Planning
Taylor & Francis Verlag | 1992
|