A platform for research: civil engineering, architecture and urbanism
Optimization of slope angle of a lead-zinc mine
Summary The present study represents an attempt to optimize the overall slope angle of a lead-zinc mine in Rajasthan state, which could extend to a depth of 170 m during the first phase of mining. Detailed geotechnical investigations were conducted. These included geotechnical mapping, determination of the physio-mechanical properties of intact rock, determination of the rock mass rating and estimation of rock mass properties. Information was collected from mapping of benches and borehole logs. Based on these data, limit equilibrium and numerical simulation techniques were applied in order to assess the stability of the slopes and determine an optimum slope angle. From these investigations it has been inferred that the overall footwall and hangingwall slopes should be 42° and 48° respectively.
Optimization of slope angle of a lead-zinc mine
Summary The present study represents an attempt to optimize the overall slope angle of a lead-zinc mine in Rajasthan state, which could extend to a depth of 170 m during the first phase of mining. Detailed geotechnical investigations were conducted. These included geotechnical mapping, determination of the physio-mechanical properties of intact rock, determination of the rock mass rating and estimation of rock mass properties. Information was collected from mapping of benches and borehole logs. Based on these data, limit equilibrium and numerical simulation techniques were applied in order to assess the stability of the slopes and determine an optimum slope angle. From these investigations it has been inferred that the overall footwall and hangingwall slopes should be 42° and 48° respectively.
Optimization of slope angle of a lead-zinc mine
Singh, V. K. (author) / Rao, D. G. (author) / Prasad, M. (author) / Sinha, A. (author)
1995
Article (Journal)
English
mine , opencast , rock mass rating , Slope
Study on Optimization Method of the Slope Angle Design for Open-Pit Mine
Trans Tech Publications | 2013
|Teck Restarts Washington Zinc/Lead Mine
Online Contents | 2015
New lead-zinc mine has been completed
British Library Online Contents | 1997
NEWSMAKERS - Lead and Zinc Mine Costs Study
Online Contents | 2001
Slope angle dangerous rock removing device for mine geological disaster prevention and control
European Patent Office | 2023
|