A platform for research: civil engineering, architecture and urbanism
Production scheme for compensation injection of hardening mixtures in soils during the construction of a tunnel in Lefortovo
Abstract An alternate production scheme is proposed for compensation injection, which will provide for an increase in the three-dimensional stiffness of the foundation beds of buildings and parking areas located above a tunnel currently under design, and also entities falling into the activesettlement basin of the ground surface. Implementation of the scheme may be a critical link in the system employed to monitor the deformations of a soil mass in the most critical areas of construction.
Production scheme for compensation injection of hardening mixtures in soils during the construction of a tunnel in Lefortovo
Abstract An alternate production scheme is proposed for compensation injection, which will provide for an increase in the three-dimensional stiffness of the foundation beds of buildings and parking areas located above a tunnel currently under design, and also entities falling into the activesettlement basin of the ground surface. Implementation of the scheme may be a critical link in the system employed to monitor the deformations of a soil mass in the most critical areas of construction.
Production scheme for compensation injection of hardening mixtures in soils during the construction of a tunnel in Lefortovo
Smoldyrev, A. E. (author)
2000
Article (Journal)
English
Local classification TIB:
770/6545/8000
BKL:
56.20
Ingenieurgeologie, Bodenmechanik
British Library Online Contents | 2000
|Monitoring of structures and environment when constructing Lefortovo Tunnel in Moscow
British Library Online Contents | 2004
British Library Online Contents | 1998
|Freezing of soils during the construction of a hydraulic tunnel
Springer Verlag | 1973
|Freezing of soils during the construction of a hydraulic tunnel
Online Contents | 1973
|