A platform for research: civil engineering, architecture and urbanism
Construction of the kettle rapids hydro development
Conclusions The creation of a temporary village from ready-made house trailers and the buildings of the auxiliary enterprises from factory-made units is sensible in a little-inhabited permafrost region.The use of a shelter over the powerhouse permitted concreting practically the year-round under rigorous climatic conditions.Preparation of the foundations for embankments located on peat bogs and permafrost during the winter is the most rational for the given conditions.
Construction of the kettle rapids hydro development
Conclusions The creation of a temporary village from ready-made house trailers and the buildings of the auxiliary enterprises from factory-made units is sensible in a little-inhabited permafrost region.The use of a shelter over the powerhouse permitted concreting practically the year-round under rigorous climatic conditions.Preparation of the foundations for embankments located on peat bogs and permafrost during the winter is the most rational for the given conditions.
Construction of the kettle rapids hydro development
Troitskii, A. A. (author) / Moiseev, I. S. (author)
1975
Article (Journal)
English
BKL:
56.30
Wasserbau
Local classification TIB:
770/6550/8000
Construction of the kettle rapids hydro development
Springer Verlag | 1975
|Engineering Index Backfile | 1918
|Priest rapids hydro-electric project
Engineering Index Backfile | 1962
|Engineering Index Backfile | 1958
|Whitehorse rapids power development
Engineering Index Backfile | 1960
|