Compaction of earthfill in the Nurek dam and organization of geotechnical control
Conclusions When constructing high earth — rock dams in narrow canyons with small areas of fill operations the rate of filling largely depends on reducing the time spent on compaction and geotechnical control of each layer.The use of special vibrating rollers of the PVK-70ÉA type with interchangeable roller drums and adjustable frequency of vibration and disturbing force allows them to be employed for compacting various types of soils being placed in dams; these rollers provided the high densities required by the design with a minimum expenditure of time on compacting the layer.The use of modern rapid methods when determining the geotechnical characteristics of fill materials permits placing the dam without delaying operations during the time of taking and processing soils samples.A special geotechnical service for monitoring all stages of the preparation and placement of soils in the dam is needed for ensuring the high design requirements imposed on the quality of dam construction.
Compaction of earthfill in the Nurek dam and organization of geotechnical control
Conclusions When constructing high earth — rock dams in narrow canyons with small areas of fill operations the rate of filling largely depends on reducing the time spent on compaction and geotechnical control of each layer.The use of special vibrating rollers of the PVK-70ÉA type with interchangeable roller drums and adjustable frequency of vibration and disturbing force allows them to be employed for compacting various types of soils being placed in dams; these rollers provided the high densities required by the design with a minimum expenditure of time on compacting the layer.The use of modern rapid methods when determining the geotechnical characteristics of fill materials permits placing the dam without delaying operations during the time of taking and processing soils samples.A special geotechnical service for monitoring all stages of the preparation and placement of soils in the dam is needed for ensuring the high design requirements imposed on the quality of dam construction.
Compaction of earthfill in the Nurek dam and organization of geotechnical control
Lashchenov, S. Ya. (author) / Roiko, N. F. (author)
1979
Article (Journal)
English
BKL:
56.30
Wasserbau
Local classification TIB:
770/6550/8000
Compaction of earthfill in the Nurek dam and organization of geotechnical control
Springer Verlag | 1979
|Geotechnical Characterization of an Earthfill Constructed from Schist Residual Soils
TIBKAT | 2024
|Earthfill Dam to be built by method of soil-compaction control
Engineering Index Backfile | 1935
Impervious core compaction using heavy vibrating rollers (earthfill dam)
Tema Archive | 1979
|Europe's highest earthfill dam
Engineering Index Backfile | 1957