A platform for research: civil engineering, architecture and urbanism
Reduction of water hammer in pressure conduits by programmed closing of the turbine gate apparatus
Conclusions The implementation of programmed closing for various types of turbine speed governors does not present technical difficulties when using the reliable design of the PCD developed and introduced at the Charvak hydrostation; the PCD can be implemented by the hydrostation personnel from the drawing of Soyuztekhénergo.At various hydrostations the hammer pressure can be reduced by 30–50% of its existing value without an additional increase of speed when dropping the load.
Reduction of water hammer in pressure conduits by programmed closing of the turbine gate apparatus
Conclusions The implementation of programmed closing for various types of turbine speed governors does not present technical difficulties when using the reliable design of the PCD developed and introduced at the Charvak hydrostation; the PCD can be implemented by the hydrostation personnel from the drawing of Soyuztekhénergo.At various hydrostations the hammer pressure can be reduced by 30–50% of its existing value without an additional increase of speed when dropping the load.
Reduction of water hammer in pressure conduits by programmed closing of the turbine gate apparatus
Al'terman, D. Z. (author) / Dmitrukhin, A. F. (author)
1984
Article (Journal)
English
BKL:
56.30
Wasserbau
Local classification TIB:
770/6550/8000
Reduction of water hammer in pressure conduits by programmed closing of the turbine gate apparatus
Springer Verlag | 1984
|Water hammer in conduits under pressure
Engineering Index Backfile | 1919
|Water hammer in conduits of variable diameter
Engineering Index Backfile | 1919
|Engineering Index Backfile | 1877
|