A platform for research: civil engineering, architecture and urbanism
Use of trench and pit crater charges at the construction site of the Hoa-Binh hydro development
Conclusions Crater blasting by trench and pit explosive charges made it possible in the shortest time to open and subsequently eliminate the cofferdams of the diversion canal at the construction of the Hoa-Binh hydro development.For using the available experimental and calculation-methodological principles of crater blasting in the less studied practice of blasting cofferdams and embankments, it is expedient to keep as one of the main calculation parameters the “index of action of the blast,” having transformed it to the ratio of the depth of the blasted cut and depth of the charge.
Use of trench and pit crater charges at the construction site of the Hoa-Binh hydro development
Conclusions Crater blasting by trench and pit explosive charges made it possible in the shortest time to open and subsequently eliminate the cofferdams of the diversion canal at the construction of the Hoa-Binh hydro development.For using the available experimental and calculation-methodological principles of crater blasting in the less studied practice of blasting cofferdams and embankments, it is expedient to keep as one of the main calculation parameters the “index of action of the blast,” having transformed it to the ratio of the depth of the blasted cut and depth of the charge.
Use of trench and pit crater charges at the construction site of the Hoa-Binh hydro development
Kuznetsov, V. A. (author)
1986
Article (Journal)
English
BKL:
56.30
Wasserbau
Local classification TIB:
770/6550/8000
Use of trench and pit crater charges at the construction site of the Hoa-Binh hydro development
Springer Verlag | 1986
|Use of linear crater charges in canal construction
Springer Verlag | 1977
|Use of linear crater charges in canal construction
Online Contents | 1977
|