Upgrading GTE-160 Gas Turbines at Moscow CPPs
The characteristics of PGU-450T combined-cycle units after reasonable upgrade of gas turbines to increase their capacity by 26 and 32.5 MW in winter and summer, respectively, are calculated. The upgrade will pay back in 3.5 – 6 years. The upgrade after two inspections of the hot gas path is the most profitable over the life of the gas turbine.
Upgrading GTE-160 Gas Turbines at Moscow CPPs
The characteristics of PGU-450T combined-cycle units after reasonable upgrade of gas turbines to increase their capacity by 26 and 32.5 MW in winter and summer, respectively, are calculated. The upgrade will pay back in 3.5 – 6 years. The upgrade after two inspections of the hot gas path is the most profitable over the life of the gas turbine.
Upgrading GTE-160 Gas Turbines at Moscow CPPs
Olkhovsky, G. G. (author) / Trushechkin, V. P. (author) / Makarov, O. N. (author) / Osyka, A. S. (author) / Markina, V. N. (author) / Gladkikh, I. I. (author)
2015
Article (Journal)
English
Upgrading GTE-160 Gas Turbines at Moscow CPPs
Springer Verlag | 2015
|Upgrading GTE-160 Gas Turbines at Moscow CPPs
Online Contents | 2015
|Upgrading of Latschau power station: Kaplan turbines
Online Contents | 1994
|A bi-level framework for interactive competition and CPPs-based demand response
American Institute of Physics | 2023
|Water Turbines at Bratsk HES: Design, Use, and Upgrading
Springer Verlag | 2001
|