A platform for research: civil engineering, architecture and urbanism
Productivity of a Continuous Mining System for Block Caving Mines
Productivity of a Continuous Mining System for Block Caving Mines
Productivity of a Continuous Mining System for Block Caving Mines
Orellana, L. F. (author) / Castro, R. (author) / Hekmat, A. (author) / Arancibia, E. (author)
2016
Article (Journal)
English
Local classification TIB:
560/4815/6545
BKL:
38.58
Geomechanik
/
56.20
Ingenieurgeologie, Bodenmechanik
Productivity of a Continuous Mining System for Block Caving Mines
Online Contents | 2016
|Productivity of a Continuous Mining System for Block Caving Mines
British Library Online Contents | 2017
|Cave management practice at Pt. Freeport Indonesia's block caving mines
British Library Conference Proceedings | 2002
|TIBKAT | 2007
|Investigation of Mining-Induced Fault Reactivation Associated with Sublevel Caving in Metal Mines
Online Contents | 2022
|