A platform for research: civil engineering, architecture and urbanism
Transaction costs for carbon sequestration projects in the tropical forest sector
Abstract There is general consensus that carbon (C) sequestration projects in forests are a relatively low cost option for mitigating climate change, but most studies on the subject have assumed that transaction costs are negligible. The objectives of the study were to examine transaction costs for forest C sequestration projects and to determine the significance of the costs based on economic analyses. Here we examine four case studies of active C sequestration projects being implemented in tropical countries and developed for the C market. The results from the case studies were then used with a dynamic forest and land use economic model to investigate how transaction costs affect the efficiency and cost of forest C projects globally. In the case studies transaction costs ranged from 0.38 to 27 million US dollars ($0.09 to $7.71/t $ CO_{2} $) or 0.3 to 270 % of anticipated income depending principally on the price of C and project size. The three largest cost categories were insurance (under the voluntary market; 41–89 % of total costs), monitoring (3–42 %) and regulatory approval (8–50 %). The global analysis indicated that most existing estimates of marginal costs of C sequestration are underestimated by up to 30 % because transaction costs were not included.
Transaction costs for carbon sequestration projects in the tropical forest sector
Abstract There is general consensus that carbon (C) sequestration projects in forests are a relatively low cost option for mitigating climate change, but most studies on the subject have assumed that transaction costs are negligible. The objectives of the study were to examine transaction costs for forest C sequestration projects and to determine the significance of the costs based on economic analyses. Here we examine four case studies of active C sequestration projects being implemented in tropical countries and developed for the C market. The results from the case studies were then used with a dynamic forest and land use economic model to investigate how transaction costs affect the efficiency and cost of forest C projects globally. In the case studies transaction costs ranged from 0.38 to 27 million US dollars ($0.09 to $7.71/t $ CO_{2} $) or 0.3 to 270 % of anticipated income depending principally on the price of C and project size. The three largest cost categories were insurance (under the voluntary market; 41–89 % of total costs), monitoring (3–42 %) and regulatory approval (8–50 %). The global analysis indicated that most existing estimates of marginal costs of C sequestration are underestimated by up to 30 % because transaction costs were not included.
Transaction costs for carbon sequestration projects in the tropical forest sector
Pearson, Timothy R. H. (author) / Brown, Sandra (author) / Sohngen, Brent (author) / Henman, Jennifer (author) / Ohrel, Sara (author)
2013
Article (Journal)
Electronic Resource
English
BKL:
43.47
Globale Umweltprobleme
/
43.47$jGlobale Umweltprobleme
Analysis of the production and transaction costs of forest carbon offset projects in the USA
Online Contents | 2012
|Assessment of transaction costs for construction projects
Taylor & Francis Verlag | 2022
|Factors That Affect Transaction Costs in Construction Projects
Online Contents | 2013
|Factors That Affect Transaction Costs in Construction Projects
British Library Online Contents | 2013
|