A platform for research: civil engineering, architecture and urbanism
Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Presented are the results of trial runs, comprehensive testing, and the power ascension of the K-175-180-12,7 steam turbine of Unit 5 at the Berezovskaya GRÉS, topped with two 29 MW gas turbines (SGT700) that exhaust to the furnaces. Features of starting up the steam turbine with combined high-intermediate-pressure cylinder and dual-bypass thermal circuit and ways to ensure reliable normal operation are considered.
Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Presented are the results of trial runs, comprehensive testing, and the power ascension of the K-175-180-12,7 steam turbine of Unit 5 at the Berezovskaya GRÉS, topped with two 29 MW gas turbines (SGT700) that exhaust to the furnaces. Features of starting up the steam turbine with combined high-intermediate-pressure cylinder and dual-bypass thermal circuit and ways to ensure reliable normal operation are considered.
Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Voronov, E. O. (author) / Kramarenko, S. V. (author) / Tarashchuk, A. M. (author) / Radin, Yu. A. (author) / Chertkov, A. I. (author)
2017
Article (Journal)
Electronic Resource
English
BKL:
56.30
Wasserbau
/
56.30$jWasserbau
Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Online Contents | 2017
|Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Springer Verlag | 2017
|Results of long-term operation of cascade tubular air heaters at the berezovskaya grés
Springer Verlag | 2004
|British Library Online Contents | 1992
Development and operation of unit 3 at the Kashira GRÉS
Online Contents | 2012
|