A platform for research: civil engineering, architecture and urbanism
Construction Technique of Vertical Shafts Excavation Above Subway Tunnel
Abstract Taking the foundation pit construction of the section K0 + 700 ~ + 900 of Shuangjiehe Road, Tinghai Road and other underground roads in Qianhai District of Shenzhen as an example, this paper introduces a new key construction technology of deep and large foundation pit excavation in the coastal area of reclamation to control the uplift and deformation of underground subway, which effectively utilizes the principle of space–time effect. Based on the number of finite difference software FLAC 3D numerical analysis, the skip excavation method and key construction parameters are simulated and optimized. The monitoring data show that the excavation method, sequence and construction protection measures have significant effect on the deformation control of subway tunnel, which can provide reference for similar projects.
Construction Technique of Vertical Shafts Excavation Above Subway Tunnel
Abstract Taking the foundation pit construction of the section K0 + 700 ~ + 900 of Shuangjiehe Road, Tinghai Road and other underground roads in Qianhai District of Shenzhen as an example, this paper introduces a new key construction technology of deep and large foundation pit excavation in the coastal area of reclamation to control the uplift and deformation of underground subway, which effectively utilizes the principle of space–time effect. Based on the number of finite difference software FLAC 3D numerical analysis, the skip excavation method and key construction parameters are simulated and optimized. The monitoring data show that the excavation method, sequence and construction protection measures have significant effect on the deformation control of subway tunnel, which can provide reference for similar projects.
Construction Technique of Vertical Shafts Excavation Above Subway Tunnel
Liu, Bo (author) / Li, Haibin (author) / Li, Li (author) / Zhao, Qingpan (author) / Gao, Jiankang (author)
2021
Article (Journal)
Electronic Resource
English
BKL:
57.00$jBergbau: Allgemeines
/
38.58
Geomechanik
/
57.00
Bergbau: Allgemeines
/
56.20
Ingenieurgeologie, Bodenmechanik
/
38.58$jGeomechanik
/
56.20$jIngenieurgeologie$jBodenmechanik
Subway tunnel deformation control method for ultra-short-distance excavation above subway
European Patent Office | 2022
|European Patent Office | 2024
|Rapid construction method for stripping excavation of foundation pit on subway tunnel
European Patent Office | 2023
|Construction process of foam concrete light roadbed above subway tunnel
European Patent Office | 2021
|European Patent Office | 2021
|