Scheduling Linear Construction Projects with Constraints on Resource Availability
Abstract Production rates for various activities and overall construction project duration are significantly influenced by crew formation. Crews are composed of available renewable resources. Construction companies tend to reduce the number of permanent employees, which reduces fixed costs, but at the same time limits production capacity. Therefore, construction project planning must be carried out by means of scheduling methods which allow for resource constrains. Authors create a mathematical model for optimized scheduling of linear construction projects with consideration of resources and work continuity constraints. Proposed approach enables user to select optimal crew formation under limited resource supply. This minimizes project duration and improves renewable resource utilization in construction linear projects. This paper presents mixed integer linear programming to model this problem and uses a case study to illustrate it.
Scheduling Linear Construction Projects with Constraints on Resource Availability
Abstract Production rates for various activities and overall construction project duration are significantly influenced by crew formation. Crews are composed of available renewable resources. Construction companies tend to reduce the number of permanent employees, which reduces fixed costs, but at the same time limits production capacity. Therefore, construction project planning must be carried out by means of scheduling methods which allow for resource constrains. Authors create a mathematical model for optimized scheduling of linear construction projects with consideration of resources and work continuity constraints. Proposed approach enables user to select optimal crew formation under limited resource supply. This minimizes project duration and improves renewable resource utilization in construction linear projects. This paper presents mixed integer linear programming to model this problem and uses a case study to illustrate it.
Scheduling Linear Construction Projects with Constraints on Resource Availability
Biruk, S. (author) / Jaśkowski, P. (author)
2017
Article (Journal)
Unknown
Scheduling Linear Construction Projects with Constraints on Resource Availability
DOAJ | 2017
|Scheduling of deconstruction projects under resource constraints
British Library Online Contents | 2002
|Scheduling of deconstruction projects under resource constraints
Online Contents | 2002
|Two heuristics for scheduling multiple projects with resource constraints
Taylor & Francis Verlag | 1996
|Two heuristics for scheduling multiple projects with resource constraints
Online Contents | 1996
|