A platform for research: civil engineering, architecture and urbanism
Economic considerations
Abstract This chapter considers costs under a number of headings: Costs for project appraisal Cost of estimating for pipejacking and microtunnelling Key cost variables for pipejacking and microtunnelling. Typical current cost levels — direct and indirect Costs of crossings A comparison with costs of open-cut construction
Economic considerations
Abstract This chapter considers costs under a number of headings: Costs for project appraisal Cost of estimating for pipejacking and microtunnelling Key cost variables for pipejacking and microtunnelling. Typical current cost levels — direct and indirect Costs of crossings A comparison with costs of open-cut construction
Economic considerations
C. Eng., Eur. Ing. Thomson, James C. (author)
Pipejacking and Microtunnelling ; 238-259
1993-01-01
22 pages
Article/Chapter (Book)
Electronic Resource
English
HIGH-PERFORMANCE CONCRETE: ECONOMIC CONSIDERATIONS
Online Contents | 1998
|ECONOMIC CONSIDERATIONS IN FACILITY PLANNING
Wiley | 1970
|Foundations -- Some technical and economic considerations
Engineering Index Backfile | 1964
|Some economic considerations in coke-oven practice
Engineering Index Backfile | 1918
|Economic Sustainability Considerations in Asphalt Pavement Design
Springer Verlag | 2016
|