A platform for research: civil engineering, architecture and urbanism
Optimization for Project Scheduling
In this chapter, the literature on mathematical optimization of the construction project scheduling problems is systematically reviewed. Despite the existence of review studies on the project scheduling problem in the research background, so far no research work has been done to examine and further classify the mathematical aspects of the problem modeling and solution approaches. Besides, no research explains the mathematical details of modeling, solution methods, and the development process of the problem. This chapter is organized to cover these research gaps and proposing some potentials for further extension of the concept.
Optimization for Project Scheduling
In this chapter, the literature on mathematical optimization of the construction project scheduling problems is systematically reviewed. Despite the existence of review studies on the project scheduling problem in the research background, so far no research work has been done to examine and further classify the mathematical aspects of the problem modeling and solution approaches. Besides, no research explains the mathematical details of modeling, solution methods, and the development process of the problem. This chapter is organized to cover these research gaps and proposing some potentials for further extension of the concept.
Optimization for Project Scheduling
Golpîra, Hêriş (editor) / Golpîra, Hêriş (author) / Safaeipour, Sina (author) / Khan, Syed Abdul Rehman (author)
Application of Mathematics and Optimization in Construction Project Management ; Chapter: 3 ; 51-78
2021-12-13
28 pages
Article/Chapter (Book)
Electronic Resource
English
Scenario‐oriented repetitive project scheduling optimization
Wiley | 2023
|Economic optimization of construction project scheduling
Taylor & Francis Verlag | 1990
|Multimode Project Scheduling Based on Particle Swarm Optimization
Online Contents | 2006
|